Organization Members
Email Role Joined Actions
Loading...
Assign Task
1.0 Owner Review Reports
2.0 Review Engineer Reports
3.0 Site Specific Design and Planning
3.1 Tower Crane Erection Plan and Drawings
3.2 Foundation and Structural Support Design
3.3 Engineering Review Reports
3.4 Climbing Plan and Procedures
3.5 Travelling Base Plan and Procedures
4.0 Technical Data
4.1 Tower Crane OEM Manuals and Information
4.2 Tower Crane Schematics
4.3 Engineering Documents
4.4 Climbing Structure
4.5 Travelling Track, Rail, and Bed
4.6 Special Inspection Reports
5.0 Maintenance and Inspection History
5.1 Operator and Maintenance Logs
5.2 Electrical and Control Systems
5.3 Mechanical and Hydraulic Systems
5.4 Climbing System
5.5 Travelling Base System
5.6 10-Year Inspection Reports
6.0 Wire Rope
6.1.1 Load Line – Specifications and Certifications
6.1.2 Load Line – Inspection Reports
6.2.1 Boom Line – Specifications and Certifications
6.2.2 Boom Line – Inspection Reports
6.3.1 Trolley Line – Specifications and Certifications
6.3.2 Trolley Line – Inspection Reports
7.0 Inspection Reports
7.1 Pre-Erection Inspection
7.2 Post-Erection Inspection
7.3 Annual Inspection
7.4 Climbing System Inspection
7.5 Travelling Base System Inspection
8.0 Training and Personnel
9.0 Appendices
Appendix A: Definitions, Interpretations and FAQs
Appendix B: Report Templates
Check all that apply.
Tasks
Title Assigned To Crane Status Due Actions
Loading...





Assign Crane
Cranes
Project Name Project Address Crane Model Crane Make Actions
Loading...





Add Crane